REPORT AND ESTIMATE
No. 3 of truź
SURVEYOR GENERALS
Repairs to Streets in
ESTIMATE OF THE EXPENSE FOR
Pretoria
Victoria,, December 15ly.
$1500-
P.
P.
OF 1868.
OFFICE OF SURVEYOR GENERAL
(Art. of Instructions, No. 38.)
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR Repairs to Drains
in Victoria
REPORT AND ESTIMATE No. 74
Darro December
1867.
PLAN OR DESCRIPTION.
MATERIALS
PARTION
265
MATERIALS
PARTICULARE.
LABOUR.
TO AR
PURCHASED.
YI DE ISSUED FROM STONES.
for WORK TO YR PERFORMED
TOTAL.
DE CONTRAVINY,
$
&
8
X
KAL
During the year
the Iron Stench Traps mentioned the last annual Report have been receivedt from England and several of them have been fixed.
As anticipated they are liable to be chosed during heavy falls of rain, but on the other hand there are
which they. places
are most useful, and in which without their it would be impossible
new
L
care to
to prevent efflux escaping from the drains.
Generally the drainage may be said to be in a fairly effecient state and sufficient with. carry off the sewerage of the City until a completely
systecu is introduced. The culvert under the Potifulum Road near Inland Lot ygy is found to be too small to carry off the torrent of water which comes down during heavy rains it is proposed to replace the existing 3 foot fulvart by a to foot one the Jonant having agreed to pay for that portion of the Culvert which inmediately adjoins his hot. A Culvert is also required between Raine Froud and Martiet Street, north of R: 2 Jant, hitherts this has been open Kullah causing considerable annoyance to the neighbourhood. With there two exceptions the work done under this Report and Estimate will be con. fined to the repair of existing drains.
the sum voted for
the
service is the came as last.
4year
lutvert adjoining & Loggy Pottfulum Road $6. 34 fext line; & foot Flat Topped blone
$20 feetlin: 5 foot egg shaped Stone kilvents
between 12. Jack and Market Shack. DBY. Fixing 50 Cast Iron Struch Taps 2 $5.
ndry repairs to Draws in Victoria 10 Roolies comployed in clearing Pipe holes during the rains 6 months
beach
f
Casualties,...
$33 13.
Approved,
(signed) A. G. MacDonnell –
Governor.
204
840
2.50
7000
360
34.10
TOTAL.......
3000
Milan
Surveyor General.
No comments yet.
Private notes are available after approval.